Saturday Work 4/15
Crews will be onsite Saturday, 4/15 from 7 a.m. to 5 p.m. Flooring, electrical, and mechanical crews will be working on various projects inside the building. Outside, crews will be installing fiber cement panels and working on roofing depending on the weather.
During the week, crews will be using the swing stage scaffolding and boom lifts to install roofing and the cement panels on the sides of the building. Site work is also being done in preparation for installing the storm sewer and foundations. Fill is being brought in that will be used to bring the site up to grade.
Crews are anticipating bringing the site work up to grade fully by mid-May to allow for settlement since we cannot utilize vibratory compaction. This will generate minimal vibrations due to bulldozer movement, static roller and dump truck tailgates closing. Vibration monitoring is in place and all vibrations to date have been within what is considered to be normal range.
Wendy Boyce | 4/13/2023
You may also like
No related posts found.