Saturday Work 5/13
Crews will be on site Saturday, 5/13 from 7 a.m. to 5 p.m. Site work, fiber cement panel installation on the entrance canopy, and roofing work might be taking place. All work is weather depending.
During the week, crews continue to work on finishing touches inside the building. Outside, crews are working on the drive through canopy ceiling, sidewalks/aprons, roofing, and potentially asphalt paving at the end of the week and the week of 5/22.
Vibration monitoring continues for any potential soil compaction work. LeChase has secured a city sidewalk closure permit to replace the damaged sidewalk next to the site on Mt. Vernon. The sidewalks were damaged from heavy equipment being moved over them during construction. It should be reopened by the end of next week.
Wendy Boyce | 5/11/2023