Crews will be onsite Saturday 10/22 from 7 a.m. to 5 p.m. conducting miscellaneous exterior work from the swing stage scaffolding, window installation on the east elevation, brick on the south side of the building, and roofing on the south building/tower penthouse.

During the week, crews will be using the tower crane and buck hoist for activities on site. Full height drywall and drywall finishing is happening on all floors. The prime and first coats of paint are being painted on floors where drywall is done. Mechanical, electrical, and plumbing rough ins continue throughout the building.  

Typical levels of construction noise and vibrations are expected with all of these activities. Any possible vibrations will be monitored by a third party testing agency.

 