Generator Testing Rescheduled

The previous scheduled generator load testing has been rescheduled to Saturday, Aug. 8. The testing will start at 7 a.m. and finish around 4 p.m. It is expected to sound like a truck motor running.

Generator Testing Delayed

The generator testing previously scheduled for this weekend (Saturday 6/27) is being put on hold. Another blog post will be sent out when the work is rescheduled.

Generator Testing

On Saturday (6/27), we will be conducting code required generator load testing. The testing will start at 8 a.m. and finish around 12 p.m. The equipment will be setup with cabling along the Mt. Vernon Ave. side of the building on Friday (6/26). The testing will sound like a truck motor running.

Generator Testing

On Friday, October 4, contractors will begin setting up for the annual required electrical testing for two of our generators. This involves temporarily installing two large pieces of electrical equipment on the south side of the building in the turnaround. The test will happen on Saturday, October 5, starting at 7 a.m. and last until around 4 p.m. Generator noise can be expected during this time.