Skip to main content

menu

2nd Fuel Tank Installation Begins

The first of two underground fuel tanks was set in place this week. Crews have started work for the installation of the second fuel tank (which will be located where the green X is on the blog photo). The 2nd tank is anticipated to be delivered on December 18. The crane used to unload the tank will access the site from Mt. Vernon while the tank itself will be delivered via South Avenue.  Dump truck traffic, delivery trucks and dumpster deliveries and removals continue to utilize the South Access Drive off South Avenue with no deliveries before 7 a.m. in accordance with the City of Rochester noise ordinance.

No work is scheduled for Christmas Day or New Year’s Day.

Work Begins on Fuel Tank Installation

Site work has resumed starting with excavation for the shoring and fuel tanks which will take place over the 2 weeks. A new pipeline is also being installed during this time. Both projects are expected to create noise of debris dumping and back up trucks. There is also the potential for some minor vibration. There will be no work on Thanksgiving Day.

Due to the location of the fuel tank installation, crews will need to use the Mt. Vernon Ave. site access as the main entrance for deliveries to and from the site for about two weeks. Trucks using this route will drive from the Mt. Vernon access point down to Rockingham and through to South Ave. and will return using the same route.