MRI Replacement Project

A mobile crane will be on site on December 16 to place the chiller on the roof. The crane will include noise from the engine running and will have backup beeping noises with in motion. It will be on sire from 7 a.m. to noon. The framework made of galvanized steel was hoisted to the roof by crane on December 9. 

North Retaining Wall Update 12/5

The north wall is slowly progressing. The engineering team has decided that additional  supports would benefit the integrity of the wall. Those supports are in the process of being designed and built. Because of the need for extra supports, the project will most likely not be finished until after Christmas.

No MRI Construction This Weekend 12/7 and 12/8

There will be no outdoor work this weekend. Work on the roof will continue this week for the preparation for the new chiller. On Monday, supports for the chiller will be installed and on Monday, December 16 a crane is scheduled to arrive in the morning and place the chiller on the roof of the hospital. This work should be completed by noon. The MRI is scheduled to be delivered on Saturday, December 28.

North Wall Construction

Construction on the North Wall will continue after the Thanksgiving holiday.

No MRI Construction the Next Two Weekends

There is no work going on outside for the next two weekends. After Thanksgiving, work will begin on the roof to install bracing and framework for the new Chiller, that is expected to arrive in mid-December. The MRI is still on target to be delivered on Saturday, December 28.